990-1217 07/02 BroadBand Conversion Kit Additional Generator Status Monitoring User’s Manual
1 Chapter 1 General Information The Conversion Kit is used to provide additional status monitoring capabilities for t
2 Chapter 2 Installation and Maintenance Only trained service personnel should install and maintain the Power Supply. Unpacking The packaging is
3 Power Shutdown Procedure The generator power supply must be shutdown prior to installing the Conversion Kit. 1. Ens
4 4. Route the new long harness along the outer edges of the enclosures following the path of the original wiring as closely as possible. Use t
5 Chapter 3 Service, Contact and Warranty Information Service APC makes every effort to ensure parts and equipment ar
6 Limited Warranty American Power Conversion (APC) warrants its products to be free from defects in materials and workmanship for a period of two